The Build
The Concept Behind Our Corporate Structure
I am currently developing a system
Here I will post updates:
Tap in
to the plan:

|
04/10/2026: all prototype materials purchased. 05/04/2026: all exterior and interior walls framed together. preparing for paint. 05/14/2026: heat spray paint applied to interior and exterior. 05/19/2026 insulation filled and top wall sealed, started the top enclosure 5/20/2026 internal system installed 5/20/2026 teg and heat sink installed 5/21/2026 top enclosure placed 6/2/2026 V#2 begun |
Stay updated before the public release!
Testing
Provisional Patent Filed
Testing data is now live — access is available to subscribers only.
Follow the development process as we test how sunlight exposure, heat buildup, structural positioning, reflection, and chamber design affect thermal transfer and energy output within the 44 cube prototype system.
Current Version #1 finding: Testing data suggests a repeatable correlation between increased environmental heat/sunlight exposure and stronger measurable electrical response output within the current prototype configuration.
A publicly viewable spreadsheet is now available to subscribers. Subscribe below to get access.
Note: The voice in this video is AI-generated. All content was created by me.